Interstate 90 and I-29 and I-229 Bridges in Sioux Falls

SiouxFallsBridges.png

Project Summary:

Interstate 90 East and West - Interstate 90 and Interstate 29 Interchange over I-29 drainage ditch and I-90/I-229 Interchange over I-229

  • Bridge Deck Overlays
  • Approach Slabs PCC Pavement
  • Signing and Guardrail

Sign Up for Text Notifications:

For updates on MAJOR traffic changes, subscribe to a free text-in service. To subscribe, simply text the keyword listed below to 605-566-4041. Subscribers can unsubscribe at any time. 

Text I90Bridges to 605-566-4041

Project Detour Map:
Exit 84B Detour Map.jpg Exit 396A Detour Map.jpg

Project Timeline:

April 2025 - Fall 2025

Project Updates:

July 22, 2025: Lane Closure Scheduled for Eastbound Interstate 90 Over Interstate 229 in Sioux Falls

Beginning on Wednesday, July 23, 2025, the Interstate 90 eastbound passing lane on the bridge over Interstate 229 in Sioux Falls will be temporarily closed. The closure is needed for crews to place asphalt surfacing and install guardrail. 

This work is anticipated to be completed and the eastbound I-90 passing lane reopened by Thursday, July 31, 2025. 

---

July 18, 2025: 

June 15, 2025 – July 15, 2025, Completed Work: 

Westbound I-90 bridge over I-229 

Work is complete and traffic restored.  The north loop ramps are open 

Westbound I-90 bridge over I-29 

Two-way traffic is currently in place on eastbound I-90 to allow for work.  The north loop ramps are currently closed at the interchange 

The contractor is currently working on removing delaminated concrete on the bridge deck. 

Anticipated work July 15, 2025 – Aug. 15, 2025

Westbound I-90 bridge over I-29 

The contractor plans to complete the approach slabs, all concrete paving, asphalt shoulders, guardrail, and membrane seals for the westbound I-90 structure over I-29. Once these items are complete, they will open to traffic including the north loop ramps. Remaining work may include lane closures. 

July 8, 2025 - Press Release:

On Thursday, July 10, 2025, work will begin on the Interstate 90 westbound structure over Interstate 29. Traffic control will be put into place to allow for a two-way traffic configuration on eastbound I-90 utilizing crossovers. The north loop ramps of the I-90 and I-29 interchange will be closed during this time.  

This two-way traffic configuration is anticipated to be in place until Friday, Aug. 15, 2025.

Detour maps above. 


Project Photos:


Project Contract Amount:

$3.1 Million

Project Contacts:

SDDOT: 
Brad Tiede
605-367-5680


Contractor:
Journey Group Companies