Ramp Reconstruction Work Scheduled on Interstate 90 Near Vivian
For Immediate Release:
Wednesday, April 16, 2025
Contact:
Doug Sherman, Winner Area Engineer, 605-961-4926
VIVIAN, S.D. – On Tuesday, April 22, 2025, work is scheduled to begin on the eastbound and westbound ramps at exit 214 on Interstate 90 east of Vivian. Work will also begin on the crossroad leading to S.D. Highway 248 at this same location. Project work will consist of removal of the existing asphalt and granular base followed by heavy roadway shaping in this area. New base material and asphalt will be placed on the newly finished grade.
This grading work will create a nearly impassable driving surface. Motorists should be aware that the eastbound and westbound ramps at exit 214 near Vivian and the crossroad to Highway 248 will be closed to traffic for approximately four weeks.
Work is then scheduled to begin at the crossroad leading to Highway 248 at exit 208 on I-90. Project work at this location will consist of removal of the existing base, reshaping the base, and placement of asphalt concrete. The work at exit 208 and the crossroad to Highway 248 will remain open at all times with traffic controlled by flaggers.
The grading project work is expected to be completed in June of 2025. The prime contractor for this $2.7 million construction project is Bituminous Paving, Inc. of Ortonville, MN. The overall project completion date is Nov. 7, 2025.
Find additional information about this project on the SDDOT website at https://dot.sd.gov/projects-studies/construction-projects/sd-highway-248-and-interstate-90-ramps.
About SDDOT:
The mission of the South Dakota Department of Transportation is to provide a safe and efficient public transportation system.
For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.
Read more about the innovative work of the SDDOT at https://dot.sd.gov.
-30-
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic