Project Summary:
Located east of Interstate 29 at exit 62, U.S. Highway 18 connects the city of Canton to Interstate 29 with a two-lane undivided rural highway. This stretch of Highway 18 has shown increased traffic volumes in which the current two-lane highway is reaching capacity. This eight-mile segment will be reconstructed with a four-lane divided highway to accommodate the increased traffic volumes. Additionally, this project includes the replacement of existing box culverts which are sized appropriately based on watershed information.
The project includes grading, curb and gutter, storm sewer, box culvert replacement, lighting, permanent signing, pavement marking, and surfacing.
Sign Up for Text Notifications:
For updates on MAJOR traffic changes, subscribe to a free text-in service. To subscribe, simply text the keyword listed below to 605-566-4041. Subscribers can unsubscribe at any time.
Text CANTON18 to 605-566-4041
Project Timeline:
Summer 2023 - Summer 2025
Project Updates:
July 18, 2025:
June 15, 2025 – July 15, 2025, Completed Work: The contractor has completed several tasks towards finishing the project. Ditches have been worked to finish grade along the project for drainage. Curb and gutter along the median has been completed. Asphalt shoulders along the outside of the new concrete pavement has been completed. Progress has begun on finishing the colored concrete median
Anticipated work July 15, 2025 – Aug. 15, 2025: Colored concrete median work will continue along the inside of the new concrete lanes. Work will progress along the median for the rest of the month and is the final large task towards completion.
Project Photos:
Project Contract Amount:
$45.6 Million
Project Contacts:
Contractor:
Reede Construction Inc.
Brett Aadson 605-971-0922
SDDOT:
Ryan Story 605-940-0721
Spencer Thompson 605-201-0535
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic
Region & Area Offices
Travelers
© 2025 State of South Dakota. All Rights Reserved.
Becker-Hansen Building
700 E. Broadway Ave.
Pierre, SD 57501
Modern Logic